Installing an adapter Адаптер thinkserver Lenovo Tower Server - TD100 (ThinkServer) - Type 4205

Страница: 55 из 98

background image

v

   

PCI

 

slot

 

6

 

supports

 

half-length

 

5.0

 

V

 

PCI

 

adapters

 

only.

 

v

   

PCI

 

slot

 

1

 

supports

 

half-length

 

3.3

 

V

 

PCI

 

adapters

 

only.

 

v

   

PCI

 

slots

 

2

 

through

 

5

 

support

 

full-length

 

3.3

 

V

 

signaling

 

adapters

 

only.

 

v

   

For

 

a

 

list

 

of

 

supported

 

optional

 

devices

 

for

 

the

 

server,

 

go

 

to:

 

http://www.lenovo.com/thinkserver.

Note:

 

For

 

models

 

that

 

have

 

the

 

ServeRAID-8k

 

SAS

 

controller

 

installed,

 

the

 

ServeRAID-8k

 

SAS

 

controller

 

overrides

 

the

 

standard

 

functionality

 

of

 

the

 

integrated

 

SAS/SATA

 

controller

 

with

 

RAID

 

capabilities.

 

To

 

install

 

an

 

adapter,

 

complete

 

the

 

following

 

steps:

 

 

1.

   

Read

 

the

 

safety

 

information

 

that

 

begins

 

on

 

page

 

v

 

and

 

“Installation

 

guidelines”

 

on

 

page

 

20.

 

 

2.

   

Turn

 

off

 

the

 

server

 

and

 

peripheral

 

devices

 

and

 

disconnect

 

all

 

external

 

cables

 

and

 

power

 

cords;

 

then,

 

remove

 

the

 

side

 

cover.

 

See

 

“Removing

 

the

 

side

 

cover”

 

on

 

page

 

25.

 

 

3.

   

Follow

 

the

 

cabling

 

instructions

 

that

 

come

 

with

 

the

 

adapter

 

to

 

set

 

jumpers

 

or

 

switches,

 

if

 

there

 

are

 

any.

 

Route

 

the

 

adapter

 

cables

 

before

 

you

 

install

 

the

 

adapter.

 

 

4.

   

Rotate

 

the

 

rear

 

adapter-retention

 

bracket

 

to

 

the

 

open

 

(unlocked)

 

position.

 

 

5.

   

If

 

you

 

are

 

installing

 

a

 

full-length

 

adapter,

 

press

 

on

 

the

 

release

 

lever

 

on

 

the

 

right

 

side

 

of

 

the

 

front

 

adapter-retention

 

bracket

 

to

 

release

 

the

 

retaining

 

tab

 

on

 

the

 

left

 

side

 

of

 

the

 

bracket.

 

 

6.

   

Remove

 

the

 

screw

 

that

 

secures

 

the

 

expansion-slot

 

cover

 

to

 

the

 

chassis.

 

Store

 

the

 

expansion-slot

 

cover

 

and

 

screw

 

in

 

a

 

safe

 

place

 

for

 

future

 

use.

 

Note:

 

Expansion-slot

 

covers

 

must

 

be

 

installed

 

on

 

all

 

vacant

 

slots.

 

This

 

maintains

 

the

 

electronic

 

emissions

 

standards

 

of

 

the

 

server

 

and

 

ensures

 

proper

 

ventilation

 

of

 

server

 

components.

 

 

7.

   

Touch

 

the

 

static-protective

 

package

 

that

 

contains

 

the

 

adapter

 

to

 

any

 

unpainted

 

metal

 

surface

 

on

 

the

 

server.

 

Then,

 

remove

 

the

 

adapter

 

from

 

the

 

static-protective

 

package.

 

Avoid

 

touching

 

the

 

components

 

and

 

gold-edge

 

connectors

 

on

 

the

 

adapter.

 

 

8.

   

If

 

you

 

are

 

installing

 

a

 

full-length

 

adapter,

 

remove

 

the

 

adapter

 

guide

 

1

 

(if

 

any)

 

from

 

the

 

end

 

of

 

the

 

adapter.

 

  

  

 

Chapter

 

2.

 

Installing

 

optional

 

devices

 

41