Ceiling Mount Installation H series Acer H6510BD Plus

Page: 54 from 68

background image

44

En

gl

ish

Ceiling Mount Installation

If you wish to install the projector using a ceiling mount, please refer to the 
steps below:

1

Drill four holes into a solid, structural ceiling member, and secure the 
ceiling mount base to the ceiling.

2

Choose the length combination based on actual environment. (CM-01S 
doesn’t include Type 2 and Type 3.)

Type 1

Type 2

Type 3